Oil and Gas Engineering Training Courses


Coiled Tubing Applications

REF: 15281_271417
DATE: 11 - 15 Aug 2024
LOCATION:

Kuala Lumpur (Malaysia)

INDIVIDUAL FEE:

4500 Euro



Introduction

Coiled tubing (CT) has many programs within the petroleum industry, which encompass drilling (CT drilling), cementing, wellbore cleanup, oxidizing, and hydraulic fracturing. In contrast, the immoderate friction stress loss, because of the noticeably small tubing diameter and tubing curvature (which is assumed to be secondary to the drift) of CT, regularly limits the most available fluid injection rates. Therefore, it's of realistic significance to research the drift regularity and friction homes in CT

Targeted Groups

Engineers, Senior Operations Personnel, and Company Representatives with zero-to-intermediate well intervention knowledge who are assigned to evaluate, plan, and/or execute coiled tubing, slickline, or wireline interventions.

Course Objective

  • Plan, design, control and execute interventions for Coiled Tubing
  • Enhance operational overall performance for the duration of interventions for Coiled Tubing
  • Explain the encouraged system for diverse Coiled Tubing discipline situations and packages
  • Discuss the right stress management system for any unique situation
  • Learn approximately the maximum normally used downhill gear and give an explanation for its characteristics
  • Understand a way to calculate and outline string limits for Coiled Tubing
  • Learn a way to paintings accurately with liquid nitrogen

Course Content

Unit 1: Background

  • Coiled tubing technology historical improvement
  • CT package components, operational procedures and limitation,well control principles
  • Troubleshooting procedures
  • Hydraulic applications that involve circulation of fluids.
  • Mechanical services that involve the downhole conveyance of required tools or equipment.
  • Electrical services that employ downhole tools which are powered by or transmit through an electrical cable.
  • Completions; permanent applications with coiled tubing installed either as the producing conduit or part of it for flow control or other requirements (e.g. ESP conveyance).

Unit 2: Pumping services

  • Fluid displacement (nitrogen lifting)
  • Reservoir/well improvement (acid washing/stimulation)
  • Acid washing
  • Acid stimulation (matrix acidizing)
  • Fill cleanouts (sand removal/pressure jetting)
  • High pressure jetting
  • Remedial/abandonment (sand consolidation/cementing)
  • Chemical sand consolidation
  • Cementing

Unit 3: Work string

  • Drilling/milling
  • Underreaming (within cased hole)
  • Fishing
  • Coiled tubing slickline operations

Unit 4: Stiff wireline

  • Logging
  • Perforating
  • Downhole video camera

Unit 5: Completions

  • Production and velocity strings
  • Production strings
  • Injection strings
  • Tubing patches

Oil and Gas Engineering Training Courses
Coiled Tubing Applications (15281_271417)

REF: 15281_271417   DATE: 11.Aug.2024 - 15.Aug.2024   LOCATION: Kuala Lumpur (Malaysia)  INDIVIDUAL FEE: 4500 Euro

 

Mercury dynamic schedule is constantly reviewed and updated to ensure that every category is being addressed at least once a month, if not once every week. Please check the training courses listed below and if you do not find the subject you are interested in, email us or give us a call and we will do our best to assist.