: Istanbul-Turkey: +905395991206 - Amman-Jordan: +962785666966 London-UK: +447481362802
-->

Maintenance, Inspection, Testing, Corrosion, Painting, Turnaround & Industrial Services

Preventive and Predictive Maintenance Management


Introduction:

The military initially pioneered preventive maintenance as a means to increase the reliability of their naval vessels. By simply expending the necessary resources to conduct maintenance activities intended by the equipment designer, equipment life is extended and its reliability is increased. In addition to an increase in reliability, more money is saved in comparison to the cost of a program just using reactive maintenance. Studies indicate that these savings can amount to as much as 12% to 18% on the average. Depending on a facility's current maintenance practices, present equipment reliability, and facility downtime, there is little doubt that many facilities are purely reliant on reactive maintenance. By implementing a proper preventative maintenance program, they could save much more than 18%.
This course will give participants an in-depth understanding of preventive and predictive maintenance practices; it will also cover many best practice techniques such as Total Productive Maintenance, Reliability Centered Maintenance, Condition Based Monitoring, Failure Modes and Effects Analysis, and Root Cause Failure Analysis

Targeted Groups:

  • Maintenance Managers
  • Maintenance Engineers
  • Maintenance Supervisors
  • Planning Engineers
  • Operations Professionals
  • Engineering and Purchasing Staff
  • Materials Divisions

Course Objectives:

At the end of this course the participants will be able to:

  • Develop, implement and supervise the preventive and predictive maintenance program
  • Implement the latest techniques and management styles of leading facilities and maintenance management practices
  • Optimize the effectiveness of maintenance, by using sophisticated techniques and methods, to economize time, money and resources
  • Prevent and limit equipment failures, and rework to improve the equipment's overall effectiveness and reliability
  • Decrease downtime and increase profit for their organization

Targeted Competencies:

  • Developing maintenance programs
  • Implementing maintenance programs
  • Optimizing maintenance resources
  • Implementing best practice maintenance techniques

Course Content:
Unit 1: Maintenance Overview:

  • What is maintenance?
  • Building a best in class asset register
  • Formulating the maintenance policy
  • Defining maintenance standards and allocation of resources
  • Applying maintenance strategies

Unit 2: Common Issues in an Organization:

  • Lack of accountability
  • Resource level issues
  • Work requests with insufficient information or duplicated
  • Importance of time writing daily
  • Technical history retention
  • KPI reviews - how often and why

Unit 3: Introduction to Asset Management:

  • ISO 55000 asset management definitions
  • Assets and asset systems
  • Different stages of life cycle
  • Asset management decisions and optimization
  • Understanding objectives, cost, critical factors and risk

Unit 4: Computerized Maintenance Management System (CMMS) Set-Up:

  • CMMS set-up
  • Criticality assignment SCE
  • Production critical
  • Non-critical
  • Class and classification assessment and allocation
  • Defining asset register systems
  • Packages
  • Equipment assignment
  • Allocation of main work centers
  • Cost center assignment(s)
  • Bills of Material (BOMs) advantages

Unit 5: Work Identification and Requesting:

  • Work preparation: what is required and why
  • Equipment assignment to the correct level
  • Assigning prioritization - the benefits in using prioritization
  • Best-in-class information required through Corrective Maintenance - Predictive Maintenance (CM-PM) work order(s)
  • Roles and responsibilities for work preparation

Unit 6: Work Planning and Estimating:

  • Reviewing the history and the benefits to work planning
  • Allocation of correct resources and hours
  • Identifying materials using Bills of Material (BOMs)
  • Allocation of external resources with or without Service Level Agreements (SLA)
  • Consider building relationships between activities within work order operations
  • Pre-scheduling through criticality – prioritization

Unit 7: Work Scheduling and Execution:

  • Preparing a rolling schedule - What needs to be considered
  • Aligning activities including input from other departments and any pre or post-work
  • Leveling/smoothing of resources through resource center availability
  • Dates and priorities how they impact scheduling
  • Creating and agreeing on the schedule for the next 7 to 14 days meetings
  • Importance of publishing the 7-day scheduled activities
  • 30, 60 and 90-day schedule look-ahead meetings
  • Time-writing daily and why it improves scheduling control
  • Handling emergent work and the impact to the schedule
  • Considering Extra Ordinary Maintenance (EOM) to control corrective maintenance high expenditure
  • Standard routine procedure instruction(s)
  • Toolbox talk
  • Importance of auditing work execution

Unit 8: Quality Feedback Reporting:

  • Benefits of feedback forms and technical history retention
  • Technical history review and sign off
  • Retention of technical history - The importance of future work preparation
  • Meeting reviews - What went well and where improvements can be made

Unit 9: Completion and Work Control:

  • Updating the future maintenance plans(s) and asset register through technical history feedback
  • Review of estimated versus planned versus actual costs
  • Review of man-hours expended versus estimated
  • Material usage - Question were any materials not used returned to stock?
  • Correctly signing off work order/work request through the CMMS system

Unit 10: Data Analysis Techniques:

  • Forecasting man-hours, material allocation and Service Level Agreements (SLA)
  • Identification of bad actors through the CMMS system
  • Expenditure reporting
  • PM compliance reporting
  • Schedule compliance reporting
  • CM backlog reporting
  • Reporting generic materials ordered
  • Unscheduled fill-in work
  • Mean Time to Repair (MTTR)

Unit 11: Maintenance Replacement Decisions:

  • Component replacement procedures
  • Age-based replacement policy
  • Analysis of component failure data
  • Using Weibull parameters
  • Life-cycle costing

Unit 12: Downtime Reduction:

  • Tracking downtime
  • Personnel training
  • Importance of feedback from employees
  • Outsourcing considerations
  • Considering using Overall Equipment Effectiveness (OEE)

Unit 13: Performance Reporting:

  • Primary reporting Key Performance Indicators (KPIs)
  • Secondary reporting KPIs
  • Leading and lagging KPIs

Unit 14: Root Cause Analysis:

  • Apollo Root Cause Analysis (RCA)
  • Combining Reliability Centered Maintenance (RCM) and RCA
  • Gathering data and evidence using class and characteristics

Unit 15: 5 Why Process:

  • Cause and effect chart
  • Fishbone analysis
  • Line of sight
  • Failure Mode, Effects and Criticality Analysis (FMECA)
  • Action plan
  • Management of Change (MOC) process
  • Continuous Improvement (CI) techniques


UAE (Dubai)
27/6/2021 - 1/7/2021
Euro 2500
UAE (Dubai)
14/11/2021 - 18/11/2021
Euro 2500
UAE (Dubai)
25/7/2021 - 29/7/2021
Euro 2500
Egypt (Cairo)
31/1/2021 - 4/2/2021
Euro 2500
Egypt (Cairo)
14/11/2021 - 18/11/2021
Euro 2500
Egypt (Cairo)
23/5/2021 - 27/5/2021
Euro 2500
Morocco (Casablanca)
4/4/2021 - 8/4/2021
Euro 2500
Jordan (Amman)
19/12/2021 - 23/12/2021
Euro 2500
UK (London)
1/2/2021 - 5/2/2021
Euro 4500
UK (London)
25/10/2021 - 29/10/2021
Euro 4500
UK (London)
14/6/2021 - 18/6/2021
Euro 4500
Egypt (Sharm El-Sheikh)
5/9/2021 - 9/9/2021
Euro 2500
Malaysia (Kuala Lumpur)
11/4/2021 - 15/4/2021
Euro 3500
Malaysia (Kuala Lumpur)
19/9/2021 - 23/9/2021
Euro 3500
Malaysia (Kuala Lumpur)
22/8/2021 - 26/8/2021
Euro 3500
Turkey (Istanbul)
26/12/2021 - 30/12/2021
Euro 3000
Turkey (Istanbul)
29/8/2021 - 2/9/2021
Euro 3000
Turkey (Istanbul)
18/4/2021 - 22/4/2021
Euro 3000
France (Paris)
1/11/2021 - 5/11/2021
Euro 4500
France (Paris)
3/5/2021 - 7/5/2021
Euro 4500
Switzerland (Geneva)
13/12/2021 - 17/12/2021
Euro 4500
Spain (Barcelona)
25/1/2021 - 29/1/2021
Euro 4500
Spain (Barcelona)
18/10/2021 - 22/10/2021
Euro 4500
Spain (Barcelona)
12/7/2021 - 16/7/2021
Euro 4500
Italy (Rome)
14/6/2021 - 18/6/2021
Euro 4500
Italy (Rome)
29/11/2021 - 3/12/2021
Euro 4500
Manama (Bahrain)
11/7/2021 - 15/7/2021
Euro 2500
Manama (Bahrain)
4/4/2021 - 8/4/2021
Euro 2500
Oman(Muscat)
30/5/2021 - 3/6/2021
Euro 2500
Kuwait (Kuwait)
24/10/2021 - 28/10/2021
Euro 2500
Spain (madrid)
24/5/2021 - 28/5/2021
Euro 4500
Spain (madrid)
19/7/2021 - 23/7/2021
Euro 4500
Singapore (Singapore)
25/10/2021 - 29/10/2021
Euro 4500
USA (Boston)
27/9/2021 - 1/10/2021
Euro 5000
Netherlands (Amsterdam)
12/7/2021 - 16/7/2021
Euro 4500
Netherlands (Amsterdam)
21/6/2021 - 25/6/2021
Euro 4500
Canada (Toronto)
8/11/2021 - 12/11/2021
Euro 5000
Online
22/8/2021 - 26/8/2021
Euro 1250
Online
10/10/2021 - 14/10/2021
Euro 1250
Online
9/5/2021 - 13/5/2021
Euro 1250